Mark Van Dyne

Mark Van Dyne
Marketing Director
Email Mark
P: 816-822-4343
F: 816-822-3434

Putting Your Best Environmental Foot Forward

Putting Your Best Environmental Foot Forward

YOU WANT to be seen as environmentally friendly.

YOU NEED permitting guidance.

Burns & McDonnell helps YOU SUCCEED with both.

Environmental Studies & Permitting Services
— for All Projects, All Places

  • Air and noise
    • Air dispersion modeling
    • Permitting
    • Noise
    • Ambient air quality
    • Meteorology
    • Compliance
  • Aquatic services
    • Aquatic ecological surveys
    • 316(a) 
    • 316(b)
    • Fisheries surveys
    • Discharge plume
    • Water quality
    • Water resource studies
    • Hydrologic studies
  • Construction and environmental monitoring
    • Permit compliance
    • Stormwater Pollution Prevention Plan (SWPPP) management
    • Cultural resources
    • Protected species
    • Wetlands
    • Erosion and sediment control
    • Biological monitoring
    • Restoration and mitigation
    • Tablet PCs and data management
  • Cultural resources

    • Architectural evaluations
    • Historic/prehistoric investigations
    • Section 106 consultation
  • Ecological services
    • Biological studies
    • Habitat assessments
    • Terrestrial biological surveys
    • Threatened and endangered species surveys
    • Protected species
    • Vegetation surveys
    • Avian protection plans
  • Electrical transmission line routing
    • State licensing and siting
    • Expert witness testimony
    • Public involvement
    • GIS mapping
  • Erosion and sediment control
    • NPDES permitting
    • Stormwater pollution prevention plans (SWPPPs)
    • Installation and maintenance of erosion and sediment controls
    • Field inspections
  • Lake management
    • Watershed assessments
    • Stream and channel bank erosion surveys
    • Lake assessments and surveys
    • Lake management plans, system designs and implementation
  • Land and right-of-way acquisition
    • Title search and review
    • Access permissions
    • Survey and legal descriptions
    • Land valuation studies
    • Encroachment management
    • Easement and plat preparation
    • Negotiation and acquisition
    • Eminent domain support
    • Construction damages resolution
    • Capacity augmentation
  • NEPA studies
    • Environmental assessments
    • Environmental impact statements
    • Socioeconomic assessments
    • Land use studies
  • Stakeholder management 
    • Strategic planning
    • Communications management
    • Stakeholder analysis
    • Risk assessment
    • Regulatory affairs
    • Public involvement
    • Media relations
    • Collateral development
    • Project event planning
    • Construction liaison and support
  • Wetlands
    • Wetland delineation and permitting
    • Design-build
    • Construction management
    • Wetland and stream mitigation
    • Wetland monitoring
    • Alternatives analysis

 

  • Federal government
  • Electrical transmission lines
  • Electrical generating facilities
  • Renewables
  • Transportation
  • State and local government
  • Private and industrial
  • Railroad

Spotlight

Southern California Edison is building 500-kV transmission infrastructure for the future

Southern California Edison is building 500-kV transmission infrastructure for the future

The Tehachapi Renewable Transmission Project is meeting challenging environmental requirements that may be a glimpse of things to come.

Read more

Projects in the public eye reap benefits from effective community relations programs

Projects in the public eye reap benefits from effective community relations programs

Big changes brought about by big projects affect stakeholders right where they live and work. Utilities have invested too much in customer relationships to let one project damage that reputation.

Read more